Follow us :

PP sheet cutter for Turkey customer

time2019/08/26

The advantage of our PP cutting machine is Convenient control, Automatic accurate cutting,With counting function,it is suitable for the PP sheet with the width of 1500mm and thickness of 1mm
PP  sheet cutting machine delivery to Turkey

Qingdao Tongsan Plastic Machinery co.,ltd  delivery the 1500mm PP sheet cutting machine to the Turkry customer.This cutter is suitable for the PP sheet with the width of 1500mm  and thickness of 1mm,it adopt the PLC control with Siemens touch screen .

The advantage of our PP cutting machine is Convenient control, Automatic accurate cutting,With counting function.

Model

HQG-1500

Control type

PLC with Siemens touch screen

Valid cutting length

Make adjustments as needed

Suitable material

PP sheet

Cutting thickness

1mm

Metering type

Rotary encoder

Motor  type

Servo motor

Motor power

1.3kw

Saw type

Wallpaper knife 25*0.9

Cutting type

automatic

Forth and back moving type

Pneumatic

Advantage

Convenient control,

Automatic accurate cutting,

With counting function

PP sheet cutter
PP sheet cutting machine
PP sheet cutter price

 WARRANTY TERMS:

1 WARRANTY PERIOD: 12 MONTHS, STARTING FROM THE FIRST DAY OF RUNNING MACHINES IN CUSTOMERS WAREHOUSE 

2 SELLER SHALL GRANT: SERVICES AND SPARE PARTS, FREE-OF-CHARGE SERVICE THROUGHOUT THE ENTIRE EQUIPMENT WARRANTY PERIOD.

3.3 LIFELONG SERVICE: THE SELLER SHOULD PROVIDE LIFELONG SERVICE FOR THE SOLD GOODS, THE BUYER PAY FOR NEEDED SPARE PARTS AFTER THE 12MONTHS WARRANTY TERMS.

DELIVERY CONDITIONS:

1 DELIVERY CONDITION: FOB QINGDAO PORT.

2 DELIVERY TERM: WITHIN 30 WORKING DAYS AFTER RECEIPT OF  ADVANCED PAYMENT, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION. THE SELLER SHOULD FINISH PACKING OF GOODS AND READY FOR SHIPMENT WITHIN 15 WORKING DAYS AFTER THE SELLER RECEIPT THE FULL PAYMENT.

3 SUPERVISION OF LOADINGTHE SELLER SHOULD INFORM THE BUYER EXACTLING LOADING TIME, THE BUYER SHOULD ARRANGE FOR SUPERVISION OF LOADING.

 PAYMENT TERMS:

1 INSTALLMENT I: 30% OF TOTAL PAYMENT TO BE PAID AT ADVANCE

2 INSTALLMENT II: THE BALANCE 70% OF TOTAL PAYMENT TO BE PAID BY TT BEFORE DELIVERY

INSPECTION:

WHEN THE MACHINE FINISHED, THE SELLER SHOULD INFORM THE BUYER TO DO INSPECTION BEFORE SHIPMENT, THE SELLER GUARANTY GOOD PERFORMANCE OF ALL THE SOLD GOODS.THE SELLER UNDERTAKE THE MATERIAL COST  FOR THE MACHINE INSPECTION IN SELLERS FACTORY. THE BUYER SHOULD COME TO SELLERS FACTORY TO DO THE INSPECTION WORK, OR THE BUYER COULD ENTRUST ANY THIRD PARTT TO COME TO SELLERS FACTORY TO DO THE INSPECTION WORK.

INSTALLATION AND EQUIPMENT COMMISSIONING:

IF THE BUYER REQUIRES, THE SELLER SHOULD SEND TECHNICIAN TEAM TO BUYERS FACTORY FOR INSTALLATION AND TESTING THE WHOLE LINE,

AND THE BUYER SHOULD UNDERTAKE THE WHOLE FOOD/PLACE AND ROUND TICKETS (AIRPLANE, FOOD, HOTEL, AND SO ON), AND PAY SALARY TO ENGINEER FOR 100 USD/DAY/ENGINEER.