Follow us :

Instructions for template installation and use

 template installation and use
1. Composite hollow building formwork is used to lay 13.5kg weight formwork on the intersecting surface, and 14kg weight formwork can be used for shear wall vertical formwork  
2. Spacing of wooden frames
1) wooden square spacing of intersecting plane: the wooden square spacing is determined according to the thickness of floor concrete
2) wooden square spacing of shear wall: the height and thickness of the wooden square spacing wall are determined
3) when no gap is left between the shear wall and the injection mold assembly, the bottom of the wall must be cubic
4) beam bottom plate of this piece of wood must be put aside 15 stop, the wall board standing in the wood stop, so will not leak pulp and save the wall board material